The project included the delivery and installation of comprehensive furnishings for a sports hall. The Lębork Sports Hall was equipped with:
- folding basketball equipment on the main pitch;
- training basketball equipment - 4 units,
- professional volleyball net poles on the main pitch and two side pitches,
- handball goals,
- ball catchers behind the goals made of polypropylene net with 10x10 centimetre mesh size,
- protective polypropylene nets installed on windows, with 4.5 x 4.5 centimetre mesh size,
- electrically operated divider curtain dividing the sports hall into two sectors,
- gymnastics ladders,
- folding wall-mounted bleachers,
- protective nets for the ceiling.